# Chain: Porridge **Entity Type:** ProductionChain ## Steps | Step | Building | Input | Output | Cycle Time | |------|----------|-------|--------|------------| | 1 | [Oat Farm](../buildings/oat-farm.md) | None | [Oats](../goods/oats.md) | 60s | | 2 | [Porridge Stand](../buildings/porridge-stand.md) | Oats | [Porridge](../goods/porridge.md) | 60s | ## Recommended Ratios Oat Farm 1 : Porridge Stand 1 (both 60s) ## Bottlenecks - Field layout - Fertility - Hauling distance